How to track new-build snags after you move in

Updated · About 4 min read · 3 official sources

Quick answer

Keep one snag register with a stable ID for each issue, its location, first-observed date, photos, reporting reference and next action. Send clear observations through the builder’s stated channel and retain replies. Separate routine finish issues from urgent safety concerns. Mark work completed only after a suitable recheck; contract and policy deadlines must come from your own documents.

One issue, one history

Keep one snag register instead of separate lists in messages, photo albums and notebooks. The useful question is: what is still open, and who has the next action?

Download the snag workbook (Excel) or use the blank CSV. The workbook has short instructions, a separate fictional example and a blank Register sheet. Start with issue, location, date reported, status and next action; detailed fields can wait. Keep the completed file private.

This suggested workflow does not set a legal reporting window or replace an inspection. The Law Society identifies arranging a qualified surveyor, architect or engineer for inspections and snagging as a buyer task.

Record an observation someone can act on

Record Make it useful
Stable ID Keep SN-001 in every photo reference and reply; do not renumber when sorting.
Precise location Room, fixture and position—not just “upstairs”.
Observation What happens and when; avoid an unverified diagnosis.
Dated evidence First observed date, overview and close-up file references.
Reporting trail Date, agreed channel, case reference and acknowledgement.
Next action Named role, action requested and follow-up date.
Completion check Work described, recheck date and result.

Fictional example: SN-001 — utility-room door — latch does not engage when closed normally — observed 21 October — photos SN-001-a/b — aftercare acknowledgement awaited.

Do not recreate a dangerous condition for a better photo. Keep clear of immediate threats and use appropriate emergency help. Electrical, structural, refrigerant and pressurised-system work requires suitable professionals.

Use statuses that show the next step

A practical sequence is Observed → Reported → Acknowledged → Visit arranged → Work reported complete → Recheck → Closed. Use Reopened if it persists or returns, preserving the original history.

These are your tracking labels, not a promise about a builder’s system. “Work reported complete” records what you were told. “Closed” records that an appropriate check has happened. Ask the relevant inspector or professional to recheck matters beyond your competence.

Send a short report through the agreed channel

Use the builder’s reporting instructions. A suggested message:

Please record issue [ID] at [location], first observed on [date]. The attached photos show [observation]. Please confirm the case reference, who will assess it and the next step. Access can be arranged through [your chosen contact method].

Save what you sent and the acknowledgement. If a call changes the plan, make a dated note and request written confirmation. Share only necessary images, avoiding people, private papers, security controls and neighbouring properties.

Before and after the visit

Agree which issue IDs the visit concerns and any access preparations. Afterwards record the date, business/contractor role, work described and promised follow-up. A visit alone does not close a row. Seek advice about any sign-off document you do not understand.

For equipment faults, add the model and service history from your handover register. Manufacturer warranty, installer workmanship, builder aftercare and structural-policy claims can follow different routes; ask which applies rather than treating them as interchangeable.

Keep deadlines and disputes evidence-based

Copy relevant deadlines from your actual sale/aftercare terms or policy, with their scope and source. Do not assume every issue has the same “first year” deadline. HomeBond’s claims procedure starts by checking whether the issued policy covers the problem.

For a serious unresolved defect, disputed obligation or approaching deadline, contact your solicitor and appropriate building professional. Keep original messages, reports and photos intact: the spreadsheet is an index to evidence, not the evidence itself.

As a household habit, periodically group open rows into awaiting your reply, awaiting assessment and awaiting recheck. Follow up using the same IDs so the next conversation can start from the latest position.

Record your first snag

Use the fictional example to get started. Add the issue, location, date reported, status and next action to your own blank Register sheet.

Download snag workbookAbout Kinrota — launching soon

Common questions

Does moving in close every snag?

This tracker cannot determine contractual rights or sign-off. Record outstanding observations and consult the builder’s terms, your solicitor and the relevant inspector.

Should I close a snag when the contractor visits?

Record the visit and what was done, then arrange an appropriate recheck. Keep the issue open if the observation remains or needs a professional assessment.

Sources

  1. Buying a home: inspections, snag list and conveyancing roles · Law Society of Ireland · checked 21 October 2026
  2. Claims procedure: refer to the issued policy · HomeBond · checked 21 October 2026
  3. Heat pump handover: equipment and installer identity · STIEBEL ELTRON Ireland · checked 21 October 2026

Researched and edited by Kinrota. Report an outdated detail with the page link and a public source. Keep private documents, addresses and account details out of your message.

This is general information, not professional advice. Always check the source and your own contracts, manuals and circumstances.