New homes

Set up electricity in a new-build home in Ireland

Updated · About 4 min read · 10 official sources

Quick answer

Establish whether your new home is already live or awaiting its first electricity connection. Get the correct MPRN, confirm your supplier account and start date, and save a dated opening reading. Supplier registration does not finish outstanding network work or electrical certification. Check the first bill against your handover record.

Is the home’s permanent supply live?

This guide covers the Republic of Ireland. Ask the developer or handover contact about your own home and meter. The CRU distinguishes a supplier account from a first network connection through ESB Networks; both are needed for a never-connected home.

Situation Next action
Permanent supply already live Confirm the move-in account, start date and opening reading with your chosen supplier.
First connection still in progress Get the application reference, outstanding actions and the person responsible for each.
Supplier cannot register the MPRN Ask why; have the connection applicant check whether it is released for registration.
Tracker says live but there is no power Ask the developer and registered electrical contractor to resolve it. Do not alter connection equipment.

ESB Networks’ tracker guidance lists supplier registration, wiring certification and readiness confirmation among scheduling requirements. “Service Live” can still need the contractor’s involvement before power is available inside. A welcome email does not prove every step is finished; request the actual status.

Verify the MPRN

The MPRN identifies the connection: 11 digits beginning with 10, provided with the new-connection quote. Ask the developer or applicant for it and confirm the attached address against your handover documents. Keep the plot reference if the final address is ambiguous.

If you have no bill or MPRN, ESB Networks says to contact it with the RM and serial number printed on the meter front. Do not enter either as the MPRN. For a registration rejection, ask about outstanding payment or applicable agreement steps before starting another application.

Keep connection responsibilities clear

Part Contact
Account, plan and registration Chosen electricity supplier
Network connection status ESB Networks, through the applicant
Installation and certification Registered electrical contractor, coordinated with the developer
Site readiness Applicant and developer or contractor managing the works

ESB Networks’ certification process requires the contractor’s certification and the validated certificate route through its regulatory body. Request your customer copy. Leave electrical work and connection equipment to registered professionals.

Make your opening record

At handover:

  1. Record the date, time, address and verified MPRN.
  2. Photograph the safely accessible meter front, including its identifier and readings.
  3. Save register labels and values. Use ESB Networks’ instructions for your meter type; ask if unsure which display is needed.
  4. Give your supplier the move-in date and opening readings, as illustrated by Energia’s guidance. Save confirmation of the accepted start date, reading and account reference.

Record a reading even with a smart meter: Electric Ireland explicitly requests this. If you missed handover, record today’s actual date and ask how the opening position will be established. Resolve differences between completion, keys and occupation dates with the developer, supplier and solicitor where relevant.

Download the electricity opening record CSV. Keep the completed copy and photos privately; this template does not submit a reading.

Check the first bill

Compare the home/MPRN, start date, billing period and opening reading with your record. Check the plan, rates, discounts, adjustments and payment date against the supplier confirmation. Energia’s bill guide explains these fields and notes that smart bills can contain estimates.

The CRU’s reading codes are A for actual, C for customer and E for estimated. Raise bill discrepancies with your supplier using the dated evidence; meter issues go to ESB Networks. If a bill is overdue against the supplier’s stated expectation, check the account and billing address.

Keep corrections and contract dates with the record. If leaving another home, tell its supplier and submit the final reading separately.

Save your opening electricity record

Record the correct MPRN, dated opening readings and supplier reference. Keep account and meter details private.

Download opening-reading recordAbout Kinrota — launching soon

Common questions

Is my MPRN the meter serial number?

No. It identifies the connection. If it is missing, ESB Networks can help using the meter's RM and serial numbers.

Does a supplier account make a new connection live?

Registration is one step. Ask the connection applicant which network, readiness or certification requirements remain.

Should I record a smart-meter opening reading?

Yes. Electric Ireland and Energia ask for move-in readings. Confirm how your supplier wants yours submitted.

Sources

  1. Electricity connections · Commission for Regulation of Utilities · checked 21 October 2026
  2. Registration — new connections · ESB Networks · checked 21 October 2026
  3. Moving home · ESB Networks · checked 21 October 2026
  4. Track your connection · ESB Networks · checked 21 October 2026
  5. Certification process · ESB Networks · checked 21 October 2026
  6. How to read my meter · ESB Networks · checked 21 October 2026
  7. Your electricity meter · Commission for Regulation of Utilities · checked 21 October 2026
  8. Moving home · Energia · checked 21 October 2026
  9. New customer hub · Electric Ireland · checked 21 October 2026
  10. Understanding your energy bill · Energia · checked 21 October 2026

Researched and edited by Kinrota. Report an outdated detail with the page link and a public source. Keep private documents, addresses and account details out of your message.

This is general information, not professional advice. Always check the source and your own contracts, manuals and circumstances.